IN Machina Wire Harness Cable & Flat Cable:It is used to transmit data, audio, video, etc. it is a kind of electric energy or signal transmission device, which is usually composed of several wires or groups of wires. IN Machina Wire Harness Cable & Flat Cable IN Machina Wire Harness Cable & Flat Cable ShenZhen Antenk Electronics Co,Ltd , https://www.antenk.com
The scope of the renovation involves fluorescent lamps for normal lighting in the GTC basement and underground second-floor parking garages, as well as normal lighting lamps in public areas. The renovation project is divided into two phases. The first phase of the project will transform the fluorescent lamps in the second floor parking area, and a total of 10,000 sets of lamps will be reconstructed. The second phase will be used to renovate other areas of GTC, and the other areas of GTC replaced 8983 sets of fluorescent lamps. 2120 sets of lights and 110 sets of loop lights.
It is reported that the GTC with a total construction area of ​​340,000 square meters is in accordance with the zone opening mode of 1/3 of the day and 2/3 of the night. There are millions of electricity consumption in the whole year. Through the replacement of LED lamps for GTC light sources, Capital Airport has made a major breakthrough in the field of light source replacement. It is expected that the annual energy saving rate of GTC will reach more than 30%.
According to estimates, after the completion of the GTC light source conversion, according to the operation mode of the existing partition opening, at least 40% of the lighting power consumption and the lighting consumption cost of 2 million yuan can be saved in the whole year, and the illuminance and use of the replaced LED light source and the lamp are used. All indicators such as life can meet or exceed the design requirements.
In order to implement the national energy conservation and emission reduction requirements and the green national gate requirements, the “Capital Airport Green Airport Construction Work Plan†was further implemented. The Capital Airport started the LED energy-saving renovation project for the No. 3 parking building (GTC) light source from the end of 2013. As of April 24, Capital Airport has successfully completed the LED Phase I and Phase II renovation projects of GTC Light Source.