1. Tender conditions Solar-powered pumps run on electricity generated by photovoltaic (PV) panels or the radiated thermal energy available from collected sunlight as opposed to grid electricity- or diesel-run water pumps.Generally, solar-powered pumps consist of a Solar Panel array, solar charge Controller, DC water pump, fuse box/breakers, electrical wiring, and a water storage tank.The operation of solar-powered pumps is more economical mainly due to the lower operation and maintenance costs and has less environmental impact than pumps powered by an internal combustion engine. Solar pumps are useful where grid electricity is unavailable or impractical, and alternative sources (in particular wind) do not provide sufficient energy. Solar Water Pump,Solar Heat Pump,Solar Air Pump,Solar Powered Pump NANTONG RONGCHANG IMPORT&EXPORT CO.,LTD , https://www.ergsolarcn.com
Tianjin Branch’s Refining Department introduced the municipal water reuse optimized water cost project. China Petroleum & Chemical Corporation Tianjin Branch adopted the “Approval for the Introduction of Municipal Water Reuse Water Optimization Project Fundamental Design for the Refining Department of Tianjin Branch†(Sinopec Corp. [2017] No. 287) The construction was approved. The bidder was China Petroleum & Chemical Corporation Tianjin Branch. The construction fund was self-raised by the company and the investment ratio was 100%. Tianjin Branch’s Refining Department has introduced the bidding conditions for the construction of a municipal contracted water optimized water cost project. The project is currently undergoing an open tender, inviting potential interested bidders to participate in bidding.
2. Project Overview and Bidding Scope
2.1 Bidding Project Name: Tianjin Refining Department introduced the municipal water reuse optimized water cost project.
2.2 Construction Site: Tianjin Binhai New Area (Dagang).
2.3 Construction Scale: Not applicable.
2.4 Construction Investment: The project's approved total investment is 928.80 million yuan (the deductible value-added tax is 1.497 million yuan), and the construction fee for this bid is about 4.1 million yuan (tax included).
2.5 Plan duration: 119 days (since the start date of construction until the completion date), the main duration node:
Date of commencement of the plan: January 10, 2018 (actual start date shall be based on the commencement date set out in the notice of commencement issued by the supervisor);
Date of scheduled delivery: May 9, 2018 (The date of actual delivery is based on the date of receipt of the engineering certificate signed by the contractor.)
2.6 Division: One bid section.
2.7 tender range of tenders:
Construction and installation within the scope of the basic design approval: (1) A DN350 water supply pipeline from the DN450 municipal secondary water pipeline outside the east wall of the Thermoelectricity Department will be buried underground to the east of the No. 3 Road of the Refinery Department, and the quality of oil refining products will be upgraded and expanded. The head of the project is shaken. After the head shake, the DN250 water supply pipeline is laid, and the pipeline is laid from the shake head to the buried road of the No. 0 section of the oil refinery section. The zero road is added to the existing north side of the atmospheric-vacuum distillation unit along the existing pipe corridor to be installed. Salt water system. The DN350 pipeline is laid 2,800 meters and the DN250 pipeline is laid 1,880 meters. (2) On the east side of Refinery Zero Road, two new demineralized water tank buffer tanks and two auxiliary tanks shall be built, and two sets of demineralized water pumps and one automatic ammonia plant shall be added. (3). In the demineralized water pumping room, two new power distribution cabinets are added, and the power source is taken from the oil refinery water treatment substation.
3. Bidder qualification requirements
3.1 The bidder should have the following basic qualifications:
(1) An independent legal person registered in the territory of the People's Republic of China;
(2) Holding a qualification certificate of general contracting for the construction of petrochemical projects issued by the construction administrative department;
(3) Holding an effective safety production license issued by the construction administrative department;
(4) Hold an effective quality management, environmental management, occupational health and safety management system certification;
(5) Since 2014, (accepting the acceptance time of the delivery (deadline) project), there are performances of construction projects for petrochemical auxiliary projects with a single contract amount of 4 million yuan and above;
(6) The company is in good financial condition, has sufficient assets and capabilities and effectively performs the contract;
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 The tender requires the bidder to propose the following personnel to not part-time other projects during the contract period of this project. The qualification requirements for the personnel are:
(1) The project manager holds the national first-class registered construction engineer qualification for mechanical and electrical engineering (registered in the bidder unit), and has an effective construction product enterprise project leader safety production assessment certificate (B certificate). Acceptance time of the delivery (delivery) shall prevail; the performance of the construction project manager of a petrochemical auxiliary project with a single contract amount of 4 million yuan or more;
(2) The person in charge of technology has advanced engineering and above technical titles;
(3) The person in charge of safety has an effective certificate (certificate C) for safe production assessment of full-time safety production management personnel of construction companies.
3.4 This tender qualification review method: After qualification review.
3.5 Potential bidders should carefully consider and decide whether to participate in the bidding of this bidding project. If you decide not to participate in the bidding after downloading the bidding documents, please notify the tenderer or the bidding agency in written form (with official corporate seal) or in written form (with legal seal) before the deadline for submitting bid documents. The tenderee will follow the provisions of the relevant provisions of the Measures for the Administration of the Credit System of the China Petrochemical Construction Market to deal with restricted bids.
4. Registration, registration, application for electronic seal and tender documents and related data acquisition
4.3 Obtaining Bidding Documents, Drawings and Other Related Materials
(1) Time of acquisition: From 17:00 on December 13, 2017 to 17:00 on December 18, 2017.
(2) Acquired deadline: 17 o'clock, December 18, 2017.