Tianjin Branch Company Ministry of Chemical Industry Mixed Benzene Process Optimization Project General Contracting Tender Notice

1. Tender conditions

Tianjin Branch Ministry of Chemical Industry mixed benzene process optimization project has been China Petroleum & Chemical Corporation Tianjin Branch to "on Tianjin Branch of the Ministry of Chemical mixed benzene process optimization project-based design approval" (Sinopec shares Jin regulation [2017] No. 294) Approved for construction, the bidder was China Petroleum & Chemical Corporation Tianjin Branch. The construction funds were self-raised by the company and the investment ratio was 100%. The general contracting for the construction of the mixed benzene process of the Tianjin Branch’s Ministry of Chemical Industry has already met the conditions for tendering. It is now conducting an open tender, and potential bidders with intentions are invited to participate in the tender.
2. Project Overview and Bidding Scope
2.1 Bidding project name: Tianjin Branch's Ministry of Chemical Industry mixed benzene process optimization project.
2.2 Construction Site: Tianjin Binhai New Area (Dagang).
2.3 Construction Scale: Not applicable.
2.4 Construction Investment: The total investment approved for this project is RMB 9,381,200 (tax deductible value-added tax is RMB 1.1608 million), and the construction cost of this bid section is about RMB 3.86 million (including tax).
2.5 Plan duration: 129 days (since the start date of the project until the completion date), the main duration node:
Planned start date: January 10, 2018 Commencement (actual start date is based on the commencement date set out in the notice of commencement issued by the supervisor);
Planned intermediate handover date: May 9, 2018;
The date of scheduled delivery: May 19, 2018.
2.6 Division: One bid section.
2.7 Tender range of bids: construction installation and installation within the scope of basic design approval. mainly include:
(1) Increase the benzene and loading functional processes of tanks such as TK-807A/B, TK-802, TK-501, TK-402 and R-106D;
(2) Transform R-105A/B to realize the separate loading function of chemical benzene and refinery benzene;
(3) Displacement between the measurement chambers of the triphenyl tank and displacement of the DCS signal of the storage tank;
(4) Increase the raffinate to olefin process.
3. Bidder qualification requirements
3.1 The bidder should have the following basic qualifications:
(1) An independent legal person registered in the territory of the People's Republic of China;
(2) Holding a qualification certificate of general contracting for the construction of petrochemical projects issued by the construction administrative department;
(3) Holding an effective safety production license issued by the construction administrative department;
(4) Hold an effective quality management, environmental management, occupational health and safety management system certification;
(5) Since 2014, (accepted by the acceptance date for the acceptance of the project), there has been a single project contracting amount of RMB 3.5 million and above for the construction performance of petrochemical auxiliary projects;
(6) The company is in good financial condition, has sufficient assets and capabilities and effectively performs the contract.
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 The tender requires bidders proposed project manager holds a Mechanical and Electrical Engineering qualification registered architect (registered bidders units), with the head of the safety assessment certificate valid construction enterprise project (B card) , Since 2014 (according to the acceptance date of the acceptance), there is a performance of the construction manager of the petrochemical auxiliary project with a single contract amount of 3.5 million yuan or more. No other project may be part-time during the contract period of the project.
3.4 The technical requirements for the bids proposed by the bidders shall include senior engineering and above technical titles.
3.5 This tender requires the bidder to designate a safety person in charge who has an effective safety production assessment certificate (certificate C) for full-time safety production management personnel of construction companies.
3.6 The method of qualification examination for tendering: review after qualification.
3.7 Potential bidders should carefully consider and decide whether to participate in the bidding of this tender project. If you decide not to participate in the bidding after downloading the bidding documents, please notify the tenderer or the bidding agency in written form (with official corporate seal) or in written form (with legal seal) before the deadline for submitting bid documents. The tenderee will follow the provisions of the relevant provisions of the Measures for the Administration of the Credit System of the China Petrochemical Construction Market to deal with restricted bids.
4. Registration, registration, application for electronic seal and tender documents and related data acquisition
4.3 Obtaining Bidding Documents, Drawings and Other Related Materials
(1) Time of acquisition: From 17:00 on December 13, 2017 to 17:00 on December 18, 2017.
(2) Acquired deadline: 17 o'clock, December 18, 2017.

Camera Filters